Projects
Preparation of an investment plan for field development
Oktyabrsky mine
Packer studies in the mine, study of the development of the water-conducting fracture zone (WCP)
Packer studies: double packer
Oktyabrsky mine
Packer studies GSS-1
Gorevskoye field
Audit of numerical models of the deposit and calculations of the stability of the pit sides
Southern part of the Norilsk-1 field
Resource Model Analysis and Mineral Resource Estimation
Oktyabrsky mine, Oktyabrsky deposit
Packer studies (Geopro) from underground mine workings
Taimyr mine, Oktyabrskoye deposit
- Packer studies (Geopro) and supervision of installation of piezometers (Sisgeo)
- Supervised installation of piezometers (Geokon)
- Packer studies (Geopro) and supervision of installation of piezometers (Sisgeo)
- Packer studies (Geopro) and supervision of installation of piezometers (Sisgeo)
Block model audit
Update of lithological-structural and block geomechanical models of 2 fields
Development of OTR for Mining and Processing Plant
22 placer and 16 primary deposits
Assessment of mineral resources and certification of ore reserves in accordance with the requirements of the JORC Code
Hydrogeological and geomechanical support of drilling operations. Development of a further study program
placers of Beenchime and Khatystakh
Preparation of a report on the results of exploration for placer diamonds in accordance with the JORC code
Cluster Gross
- Development of WMP (Water Management Plan)
- Hydrogeological model update
Cluster Gross
- Development of a lithological-structural model
- Geomechanical support of drilling operations
Measurement of POP at two fields
Training on block geomechanical modeling for geomechanical service employees
Express identification of critical risks of iron ore assets: 1 mine, 2 quarries, 2 factories
Gimmelfarb deposit
Feasibility studies (Scoping Study) of mining and processing of phosphorite ore reserves
Donskoye field
Packer surveys (IPI SWIPS) from underground mine workings
Suzdal field
- Update of GCMP (Ground Condition Management Plan) for underground mining
- Field training on structural mapping of underground mine workings
Resource model audit
Buli and Zandkom deposits
Development of WMP (Water Management Plan)
Bissa and Buli deposits
Updating GCMP (Array State Management Plan)
Bissa and Buli deposits
Development of a hydrogeological additional study program
Lefa deposit
Development of a geomechanical model
Lefa deposit
- Development of a hydrogeological additional study program
- Development of WMP (Water Management Plan)
Audit of mineral resource block model for compliance with JORC Code requirements
Asacha, lived 25
Transfer and update of lithological-structural and block geomechanical model to Micromine
Kumroch field
- Audit and assessment of mineral resources
- Audit of 3D mineral resource model
Conducting a one-day in-person training seminar for environmental specialists of a gold mining company on waste management issues (including subsoil waste)
Confidential project in the field of Rock Mechanics and Hydrogeology
Confidential project in the field of Rock Mechanics and Hydrogeology
Kovdor field
Calculation and justification of quarry design parameters
Kovdor field
Development of a program for additional study of geomechanical, hydrogeological and geological conditions of the field
Solntsevo coal mine
Development of an optimal model for transporting rock mass by quarry transport
Solntsevo coal mine
Development of a hydrogeological model. Assessment of the stability of benches and sides of the mine and external dumps
Preparation of Competent Person Report (CPR) and resource calculation according to international standards (JORC)
Risk assessment in Rock Mechanics and Hydrogeology
Geomechanical and hydrogeological studies
Supervised installation of sensors in wells
Packer studies
Structural mapping of the quarry and geomechanical analysis of the feasibility of further exploration
Bystrinskoye field
Assessment of mineral resources and ore reserves in accordance with the requirements of the JORС Code
Technology audit and audit of ES aspects as part of a financial and technical audit
Block model audit
Technical audit of 22 placer deposits
Irkutsk cluster
Audit of the geological service with development of recommendations for optimization and modernization of geological exploration techniques
Bodaibo placers
Calculation of current obligations for reclamation and closure of facilities
Kostomuksha deposit
Training of Customer specialists on working with the packer system
Kostomuksha deposit
Packer surveys (IPI SWIPS)
Technical audit of coal assets: 2 mines, 3 processing plants
Technical audit of coal assets: 14 quarries, 4 mines, 1 processing plant
Technical audit of a coal mine
Technical audit of a coal mine with preliminary development of mining development scenarios
mine "Raspadskaya"
Geomechanical audit
BFS update for combined field development
Analysis of initial data on Rock Mechanics and Hydrogeology and development of a further study program
Natalka deposit
Development of a hydrogeological model as part of a feasibility study
Doroninskoye deposit
Technical audit of the project, development of a geological exploration program, risk assessment
Obukhovskaya mine
Technical audit of coal assets
Training for Rock Mechanics of enterprises and specialists from the Rock Mechanics department of mining enterprises under the advanced training program “Hydrogeological support of mining operations”
Conducting training sessions on the examination of mining projects
Field geomechanical and hydrogeological work
Technical and economic calculation
Development of lithological-structural and resource block model
Creation of geomechanical and hydrogeological models of the field
Geomechanical studies and drilling support at the field
Geological survey audit. Analysis of job descriptions and work methods
Analysis of geomechanical and hydrogeological data and preparation of a field work program. UAV Survey and Structural Mapping
Carrying out work to ensure the quality of geological exploration at the field, MRE
Audit of technical solutions, lithological-structural and resource modeling, preparation of a mining calendar
Structural mapping of the Tyrnyauz deposit quarry
Field hydrogeological work, hydrogeological modeling
Enterprise strategy development
Preparation of a Massif Condition Management Plan (MCP) for a gold deposit
Carrying out packer studies in wells