Projects

Krasnoyarsk Territory – 4 projects
Геология

Au

Completed in

2024

Hydrogeology

Cu, Ni, Co

Completed in

2024

Hydrogeology

Completed in

2024

Hydrogeology

Cu, Ni, Co

Completed in

2024

Comprehensive Services

Pd, Zn

Gorevskoye deposit

Audit of numerical models of the deposit and slope stability analysis

Completed in

2023

Geology

Cu, Ni, Co, Pt, Pd

Southern part of Norilsk-1 deposit

Analysis of the resource model andMineral Resource estimation

Completed in

2022

Hydrogeology

Cu, Ni, Co, Pt, Pd

Oktyabrsky Mine, Oktyabrskoye deposit

Underground packer testing (Geopro)

Completed in

2023

Hydrogeology

Cu, Ni, Co

Taimyr Mine, Oktyabrskoye deposit
  • Packer testing (Geopro) and supervised piezometer installation (Sisgeo)
  • Supervised piezometer installation (Geokon)
  • Packer testing (Geopro) and supervised piezometer installation (Sisgeo)
  • Packer testing (Geopro) and supervised piezometer installation (Sisgeo)

Completed in

2022

Republic of Sakha (Yakutia) - 5 projects
Geology

Au

Completed in

2024

Rock Mechanics

Au

Completed in

2024

Mining

Fe

Completed in

2024

Comprehensive Services

Diamonds

22 placers and 16 hard rock deposits

Mineral Resource estimation and validation of Ore Reserves in accordance with the JORC Code

Completed in

2023

Comprehensive Services

Au, Ag

Gross Cluster

Hydrogeological and geotechnical supervision of drilling programs. Development of an additional study program

Completed in

2023

Geology

Diamonds

Beenchime and Khatystakh placer deposits

Preparation of a JORC-compliant report on the results of exploration of diamond placers

Completed in

2022

Hydrogeology

Au, Ag

Gross Cluster
  • Development of a Water management Plan (WMP)
  • Update of a hydrogeological model

Completed in

2022-2023

Rock Mechanics

Au

Gross Cluster
  • Development of a lithological-structural model
  • Geotechnical supervision of drilling programs

Completed in

2022

Kazakhstan — 3 projects
Rock Mechanics

Au

Completed in

2024

Training

Completed in

2024

Comprehensive Services

Fe

Completed in

2024

Comprehensive Services

Phosphorites

Gimmelfarbskoye deposit

Scoping Study of mining and processing of phosphorite ore reserves

Completed in

2023

Hydrogeology

Cr

Donskoye deposit

Underground packer testing (IPI SWIPS)

Completed in

2023

Rock Mechanics

Au

Suzdal deposit
  • Update of a Ground Control Management Plan (GCMP) for underground mining
  • On-site training in structural mapping of underground mine workings

Completed in

2022

Burkina Faso – 3 projects
Geology

Au

Completed in

2024

Hydrogeology

Bouly and Zandkom deposits

Development of a Water Management Plan (WMP)

Completed in

2023

Rock Mechanics

Au

Bissa and Bouly deposits

Update of a Ground Control Management Plan (GCMP)

Completed in

2022

Hydrogeology

Au

Bissa and Bouly deposits

Development of an additional hydrogeological study program

Completed in

2022

Guinea — 2 projects
Rock Mechanics

Au

Lefa deposit

Development of a geotechnical model

Completed in

2022

Hydrogeology

Au

Lefa deposit
  • Development of an additional hydrogeological study program
  • Development of a Water Management Plan (WMP)

Completed in

2022

Kamchatka Territory -  1 project
Geology

Au

Completed in

2024

Rock Mechanics

Au

Completed in

2024

Geology

Au, Ag

Kumroch deposit
  • Audit and estimation of Mineral Resources
  • Audit of a 3D resource model

Completed in

2022-2023

Moscow — 2 projects
Hydrogeology

Li

Confidential project in the field of geotechnics and hydrogeology

Completed in

2023

Comprehensive Services

Diamonds

Confidential project in the field of geotechnics and hydrogeology

Completed in

2023

Murmansk Region - 2 projects
Rock Mechanics

Fe

Kovdor deposit

Estimation and justification of open pit design parameters

Completed in

2023

Comprehensive Services

Fe

Kovdor deposit

Development of a program for additional studies of geotechnical, hydrogeological and geological conditions of the deposit

Completed in

2022

Sakhalin Region – 2 projects
Mining

Coal

Solntsevsky Coal Mine

Development of an optimal model for transportation of rock mass using open-pit haulage equipment

Completed in

2022

Comprehensive Services

Coal

Solntsevsky Coal Mine

Development of a hydrogeological model. Slope stability analysis for open pit and external waste dumps

Completed in

2022

Zabaykalsky Region – 1 project
Rock Mechanics

Au

Completed in

2024

Rock Mechanics

Completed in

2024

Hydrogeology

Au

Completed in

2024

Hydrogeology

Au

Completed in

2024

Rock Mechanics

Au

Completed in

2023 - 2024

Comprehensive Services

Cu, Fe, Au

Bystrinskoye deposit

Mineral Resource and Ore Reserve estimation in accordance with the JORС Code

Completed in

2022

Irkutsk Region — 1 project
Comprehensive Services

Au

Due Diligence

Completed in

2023-2024

Geology

Au

Irkutsk Cluster

Audit of Geological Department and development of recommendations for optimization and modernization of geological exploration techniques

Completed in

2023

Environmental and Social Aspects

Au

Bodaibo placers

Evaluation of current rehabilitation and closure liabilities

Completed in

2022

Karelia— 2 projects
Hydrogeology

Fe

Kostomuksha deposit

Training of Client’s specialists in using packer system

Completed in

2023

Hydrogeology

Fe

Kostomuksha deposit

Packer testing (IPI SWIPS)

Completed in

2023

Kemerovo Region - 1 project
Comprehensive Services

Coal

Due Diligence

Completed in

2024

Comprehensive Services

Coal

Due Diligence

Completed in

2024

Comprehensive Services

Coal

Due Diligence

Completed in

2023-2024

Comprehensive Services

Coal

Due Diligence

Completed in

2023-2024

Rock Mechanics

Coal

Raspadskaya Mine

Geotechnical audit

Completed in

2023

Kyrgyzstan — 1 project
Comprehensive Services

Au

Jerooy deposit

BFS updating for combined deposit mining

Completed in

2022

Magadan Region - 1 project
Rock Mechanics

Au

Completed in

2024

Hydrogeology

Au, Ag

Natalka deposit

Development of a hydrogeological model as part of a Feasibility Study

Completed in

2022

Novosibirsk Region - 1 project
Comprehensive Services

Coal

Doroninskoye deposit

Technical audit of the project, development of an exploration program, risk assessment

Completed in

2023

Rostov Region - 1 project
Comprehensive Services

Coal

Obukhovskaya Mine

Technical audit of coal assets

Completed in

2023

Sverdlovsk Region - 1 project
Training

Completed in

2024

Geology

Conducting training courses on expert examination of mining projects

Completed in

2022

> 800
projects completed by our team
> 100
clients in Russia and CIS
> 100
3D numerical models developed
80%
of mining regions in Russia are covered by our services